A packaged water plant is a NAFDAC project with machines inside it. The machines are the straightforward half, and they are not the half that delays people.
Description
A water line is two systems that get bought as though they were one. There is the treatment train, which makes the water fit to drink, and there is the filling machine, which puts it into a sachet or a bottle. Buyers concentrate on the filling machine because that is the part that looks like a factory, and then discover that the treatment side is where the money and the approval both sit.
Treatment runs from your raw source through sediment and activated carbon filtration, softening where the water is hard, reverse osmosis, and then ultraviolet and ozone before it reaches the filler. How much of that you actually need is decided by what your borehole contains, not by a supplier package. This is why the laboratory analysis comes before the equipment list rather than after it, and why we ask for it first.
On the filling side, a sachet machine forms the film, fills and seals in one continuous pass. A bottling line is separate machines in sequence: rinser, filler, capper, and a labeller if you are branding. Several producers run both, because sachet carries the volume and bottled carries the margin.
What NAFDAC will look for
Borehole depth. Where there is no municipal supply, the guidance is a borehole of 150ft or deeper. A shallow well already on the property is frequently the reason a site fails.
Independent water analysis. A detailed laboratory report on the raw water before treatment, from an analyst of the Institute of Public Analysts of Nigeria. Where the factory has no in-house quality department, a standing arrangement with an IPAN laboratory for subsequent batches.
Premises layout. A defined flow through cloakroom, packaging material store, raw material store, production, then finished goods store. Insect-proof netting on windows. Toilets accessible but away from production. Sachet and bottled production separated.
People. A Food Handlers Certificate for every member of staff, production and non-production, issued after a medical check. A production manager holding at least an OND in a science discipline.
None of that is equipment, and all of it is why plants sit idle after delivery. We tell buyers this before the machine is ordered rather than after, because the building work and the paperwork run in parallel with manufacture if you start them together.
Specification
These are the parameters that decide the right line. Figures are confirmed against the specific machine and against your water analysis before we quote.
| Raw water analysis | The first document, not the last. Hardness, iron, total dissolved solids and microbiological load decide whether you need softening, extra filtration stages, or a larger reverse osmosis unit. |
|---|---|
| Treatment capacity | Rated in litres per hour and sized above the filler, never level with it. A treatment train matched exactly to the filling machine has no margin for a backwash cycle or a filter change. |
| Filling output | Quoted in sachets or bottles per hour. Ask whether that is the machine rating or the rate it holds through a full shift, and size your storage against the second figure. |
| Film width and gauge | Decides sachet size and how much film each bag consumes. Thin film runs cheaper per bag and bursts more, and the returns cost more than the saving. |
| Sealing system | Seal integrity is the whole product. A machine that seals well cold and poorly when the shift has warmed it up will pass a demonstration and fail in production. |
| Contact materials | Food grade stainless throughout the wetted path. Confirm the grade in writing rather than accepting the word stainless. |
| Storage tanks | Raw and treated held separately, sized for the hours your power is actually available rather than for a full day. |
| Total connected load | Ask for it in kW for the whole line, pumps and compressor included. That figure sizes your generator, and the generator drives your running cost more than any other decision. |
We do not publish prices, because the landed figure depends on the specification, the Customs valuation and the exchange rate on the day you pay.
Minimum order
One line. Production machinery carries no batch minimum. A single sachet machine with its treatment train is a normal order and we handle it exactly as we would a multi-line plant.
Where minimums do appear is on consumables bought alongside: film, sealing rolls and spare filter elements are usually sold by the carton or the roll set. We ask for those figures from the supplier and put them in the quotation rather than leaving you to discover them at reorder.
Lead time is manufacture plus shipping plus clearing. We give you a range for each and keep you informed, rather than a single date that depends on a vessel schedule nobody controls.
What decides the right one
Your water, first. Two plants twenty kilometres apart can need different treatment trains, and a supplier quoting a standard package without seeing an analysis is quoting for someone else's borehole.
Then the honest daily output. Sizing on the number of hours you wish you could run produces a machine that idles, and idle capacity is paid for in cement, roof and generator whether it turns or not.
Then service. A sealing bar or a UV lamp is a consumable, and a machine whose parts take four months to arrive is a machine that stops. We ask what is held in Nigeria before we recommend a brand, because the answer changes which one is cheaper over three years.
Common questions
What is the minimum order?
One line. Production machinery carries no batch minimum, so a single sachet machine with its treatment train is a normal order and we handle it exactly as we would a multi-line plant.
Do I need a borehole before ordering?
Where there is no municipal supply, yes, and 150 feet or deeper. You also need a laboratory report on the raw water from an analyst of the Institute of Public Analysts of Nigeria before anyone can size the treatment.
Why do two factories with the same output need different equipment?
Because the water differs. Two plants twenty kilometres apart can need different treatment trains, and a supplier quoting a standard package without seeing an analysis is quoting for someone else's borehole.
What does NAFDAC inspect?
The plant rather than the machine. That includes a Food Handlers Certificate for every member of staff and a production manager holding at least an OND in a science discipline, so the building and the hiring belong on the same timeline as the equipment order.
How is the treatment capacity sized?
Above the filler, not level with it. Sizing the treatment to match the filling rate leaves you with no margin, and the filler is the part that stops.
Related products
Concrete Block Moulding Machines
Manual, egg-laying and hydraulic stationary presses. What NIS 87 actually requires of your block, and why compaction is a cement bill rather than a machine feature.
View details

Film Blowing and Nylon Extrusion Lines
Screw diameter, lay-flat width and gauge control. Specify against the micron rule that is coming rather than the one in force, because you cannot revisit a screw later.
View details

Tablet Presses and Pharmaceutical Compression
Single and double rotary presses. Tooling standard, contact materials and the qualification documents NAFDAC expects, which are worth more than the stations figure.
View details
Send us your water analysis and your target output
With those two we can tell you what treatment train you need, what filling machine matches it, what the whole line lands at in Naira with every line itemised, and what the building has to look like before NAFDAC will pass it.
There is no charge for it and it commits you to nothing. If your numbers do not support a plant at the scale you have in mind, we will tell you that too.